Abstract
Increasing energy demands in all sectors have driven new and innovative solutions to tackle the evolving energy challenges. Distributed energy resources (DERs) integration and deployment to support the grid during periods of peak demands are on the increase. However, uncontrolled integration of some renewable energy sources into the grid may affect the system inertia, culminating to a frequency shift. In this study, the contribution of DERs in grid energisation and stabilisation during black start restoration (BSR) operations is investigated. The BSR problem is formulated and executed as a dynamic optimisation problem. This enables the effective coordination of the dispatching actions of the DERs along with the switching actions of remote controllable switches (RCSs) over multiple decisions time steps. To satisfy the nature of the developed BSR method, the Mixed-Integer Linear Programming (MILP) technique was adopted and used in the performance analysis of the Nigerian 330 kV 48-bus system modelled for this study. The simulation of the MILP model was achieved in MATLAB® using the IBM CPLEX™ solver. The BSR sequence and the development of a viable restoration strategy were also actualised on the Nigerian 330 kV 48-bus system. The modelled simulated test system and the analysis resulting from the loading of a real network verified the effectiveness of the developed model.
Keywords
Black start restorationDistributed energy resourcesDynamic optimisationGrid stabilisationPower systemPower restoration sequence
Read the full article
Open the final, editor-approved full text as a PDF.